drill shafts

Signal Technology began drilled shaft foundations from its inception in 1998 starting with a single auger truck. We have over 50 years of combined experience in drilled shaft foundations with the Florida Department of Transportation, various local governments in South Florida, and private businesses. Both owners (Howell Abrams and Jeffrey Kleiss) have been installing drill shafts for over 15 years each. We install various drilled shaft foundations for Sign Structures, Mast Arms, Communication Towers, and Lighting in the South Florida Region.

Signal Technology owns 5 drill rigs with support equipment (cranes, water trucks, tractor-trailer, dump trucks and front-end loaders). We are capable of drilling shafts either by wet-hole method or by caisson 6 feet in diameter by 60 feet in depth. We are capable of providing a turn key installation with everything including the structures and erection.